Developers' Section 106 and levy payments funded £14.5m of projects in Hammersmith and Fulham in 2025/26, from the Civic Campus to school windows and parks.
Hammersmith and Fulham Council spent £14.5 million of developers’ money on local projects in 2025/26. Cabinet approved the spending at its meeting on Monday 16 November.
The money comes from two sources. Section 106 agreements are deals struck when a developer gets planning permission, to pay for things the new building puts pressure on. The Community Infrastructure Levy (CIL) is a charge on new floorspace. Both must be spent on the purposes they were collected for.
The Cabinet report puts the total at £14,465,943 in its summary table. Its project-by-project appendix shows which development paid for what.
Overview
Updated 18 November: Cabinet approved the drawdown of £14,465,944 on 16 November and noted the Uxbridge Road improvements, according to the Cabinet decision list. The decision could be called in until 3pm on Friday 20 November.
- Total: £14.5 million drawn down in the year from April 2025 to March 2026.
- Largest single sum: £1.13 million from the Olympia redevelopment, for local jobs and training.
- Biggest categories: regeneration areas (£3.13m) and economic development (£3.11m).
- Running costs: about £1.3 million, or 9 per cent, went on delivering the programme.
- Decision: Cabinet approved the spending on 16 November, for projects delivered during the year.
Where the money went
| Category | Spend |
|---|---|
| Regeneration areas | £3,133,652 |
| Economic development | £3,111,422 |
| Community facilities and borough strategic CIL | £2,569,413 |
| Environmental improvements | £1,514,378 |
| Transport and public realm | £1,434,348 |
| Neighbourhood CIL and admin | £1,304,608 |
| Affordable housing | £478,371 |
| Borough-wide community benefits | £322,002 |
| Parks, leisure and outdoor sport | £246,519 |
| Community wellbeing and social inclusion | £125,000 |
| Arts and cultural projects | £97,514 |
| Schools and higher education | £71,707 |
| Heritage and conservation | £57,009 |
The projects near you
Hammersmith
- £279,838 for the King Street design vision. It aims to join Unity Square, outside the Town Hall, with King Street to form one open public space.
- £171,686 for the Margravine Cemetery wall, and £48,280 for the cemetery’s heritage project. The report says that project restores two Grade II listed structures on Historic England’s Heritage at Risk Register.
- About £71,700 for St Paul’s Gardens, from three developments. The work included repairs to The Bothy: a new roof, pointing and leak repairs.
- £8,728 to conserve the Grade II listed Leaning Woman statue on the Great West Road.
- £93,042 for design work on the Hammersmith Grove sustainable drainage scheme, from two developments.
Fulham
- £1.62 million for window replacements. The report says the scheme covers Langford Primary School and Fulham Bilingual School, to deal with safety risks and failing windows.
- £78,692 for South Park, from the Chelsea Island development.
- £28,956 for the Godolphin Gardens playground.
- £27,148 to resurface Townmead Road, from Imperial Wharf.
Shepherd’s Bush and White City
- £732,450 from M&S White City for carbon reduction projects.
- £574,117 from the M&S White City agreement, listed against the former Dairy Crest site in the White City regeneration area.
- £47,900 for transitional support for The Bridge Academy, from the former BBC Television Centre.
Across the borough
- £2.14 million of borough CIL went to the Civic Campus redevelopment, the Riverside Gardens improvement scheme and Linford Christie Stadium. The appendix gives one figure for all three.
- £1,130,544 from Olympia for local employment and training, including a workplace coordinator.
- £387,561 towards Edith Summerskill House, where the council plans 133 homes, all of them affordable: 105 for social rent and 28 intermediate homes.
- £242,539 for the council’s Crime Fighting Strategy, which includes CCTV.
Heat pumps in council buildings
Part of the environment money matched government grants to replace old gas boilers with heat pumps. The report says gas heating makes up almost half of the council’s carbon emissions. The buildings listed include:
- the Lyric Theatre
- Lillie Road Fitness Centre and Phoenix Fitness Centre
- Hammersmith Library
- Brackenbury, Kenmont and Melcombe primary schools, and Normand Croft Community School
What it means for you
- Nothing changes for residents. The vote approved money already spent in the year.
- If you want to know what a development near you paid for, the appendix lists every agreement by its address.
- New schemes still need their own decisions. The report says residents have asked for Section 106 money to fund shopfront improvements on Uxbridge Road, but none has been allocated.
Sources
- H&F Council, Funding Community Benefits Through Planning Obligations Draw Down Report 2025/26, report to Cabinet, 16 November 2026: the total, the categories (Figure 1), the 9 per cent delivery cost and Edith Summerskill House (paragraph 4).
- H&F Council, The 2025-26 Drawdown Report, Appendix 1 to the same report: every project sum, by agreement (Tables 3 to 11).
- H&F Council, Cabinet agenda, 16 November 2026.
Have your say